Thursday, September 19, 2019

9/19/2019 Literature Review and Preparations

This week we decided on the subdivisions each member will specialize in.


Third RailShane, Alex, Melody, Rey
Conductor ShoeRyan, Chuong, Melody
Shoe Arm MechanismShane , Rey, Waylon, Melody
Proximity SensorWaylon
Wear AnalysisRyan, Chuong
InsulatorsRyan, Chuong
Proper GroundingWaylon
SafetyAlex
Power DistributionRey, Waylon
DemonstrationShane, Melody
Current/Voltage MonitorWaylon

We want to finish our specialized research by 9/23 so that we have time to collect our findings into a presentation. The presentation is due on 9/25. It consists of a literature review, functional specification, challenge anticipation, and Gantt chart.