On November 10, The Wayside Power and Distribution Team continue our meeting on the Spartan Superway Facility. On this day we are continuing our works on the CAD design and also working on our Bill of Materials (BOM). The team is working on the new CAD design which is imitating the design of a rail track.
|
Figure 1, The overall looks on the new CAD design |
Furthermore, the team is having a debate about whether the guideway material needs to be an L bracket steel or it is unnecessary. After we are looking at the cost-effectiveness and how the design will be fit in our overall wayside power, we decided that we change a bit of our rail design from a combination of L bracket steel with a wooden board to all wooden board for the rail.
|
Figure 2, The new guideway design |
No comments:
Post a Comment