The Wayside Power Team seeks to integrate commercially available products into the 2019-2020 design. In current progress the team found profound interest in certain products provided by various companies, including Conductix for third rail and Schunk Group for third rail connectors. The team continues to seek various available means to improve the wayside power design for application into Spartan Superway.
Figure 1: Conductix top-running third rail design the Wayside Power Team seeks to integrate into the Spartan Superway. 
Source: www.conductix.us 

After Wayside Power Team's first presentation, the team unanimously agreed to rework the team structure to provide improved and more consistent results for future work. In accordance the team designated members to certain task as follows:


Team Roles
Team Managers:
Project ManagerAlex
Asst. Project ManagerShane
Editors:
Grammar/ Spell-CheckMelody, Alex (secondary)
FormatShane
ConsistencyAlex
CAD:
Lead DrafterReynaldo
2nd Lead DrafterAlex
Asst. DrafterWaylon, Melody

Restructuring the team and more clearly defining team roles will help us better succeed for the future endeavor wayside power has to offer. Furthermore the team has also created a Gantt chart to illustrate the teams long term goals to succeed. This will help the team continue to work against the challenge of busy schedules and deadlines from other projects and classes that it currently faces.
Figure 2: Gantt Chart for Wayside Power Team

Written by,
 Alex Ng

Wednesday, September 25, 2019

Thursday, September 19, 2019

9/19/2019 Literature Review and Preparations

This week we decided on the subdivisions each member will specialize in.


Third RailShane, Alex, Melody, Rey
Conductor ShoeRyan, Chuong, Melody
Shoe Arm MechanismShane , Rey, Waylon, Melody
Proximity SensorWaylon
Wear AnalysisRyan, Chuong
InsulatorsRyan, Chuong
Proper GroundingWaylon
SafetyAlex
Power DistributionRey, Waylon
DemonstrationShane, Melody
Current/Voltage MonitorWaylon

We want to finish our specialized research by 9/23 so that we have time to collect our findings into a presentation. The presentation is due on 9/25. It consists of a literature review, functional specification, challenge anticipation, and Gantt chart.

Thursday, September 12, 2019

Teams and Project Proposal


This is the wayside power team. We are tasked with the design, manufacturing, and presentation of a full-scale third rail power system prototype to distribute power to a moving 'bogie'.

Contact Information:


namedepartment & capstone phone numberemail gmail
Melody (Aryamitra Bake)ME, Mechatronics650-248-9183aryamitra.bake@sjsu.edu4melodyb@gmail.com
Shane SharpME, Mechatronics503-438-0321shane.sharp@sjsu.edusharpshane27@gmail.com
Reynaldo JahjaME, Mechanical925-300-8818reynaldo.jahja@sjsu.edujahjareynaldo@gmail.com
Alex NgMe, Mechanical Design916-812-8026alex.ng@sjsu.edualex.n916@gmail.com
Ryan TongMatE510-364-0791ryan.r.tong@sjsu.eduryan.r.tong@gmail.com
Chuong NguyenMatE408-620-2172chuong.nguyen@sjsu.edupoundkickcake@gmail.com
Waylon ChanME, Mechatronics510-425-9129waylon.chan@sjsu.eduwaylon.chan3@gmail.com

Last Wednesday the group was tasked to redesign or improve the third rail power delivery system for the full-scale bogie. Our team consists of seven members that include two seniors in materials engineering and 6 seniors majoring in mechanical engineering. The group discussed the current design issues, ideas, and design requirements to prepare for the project proposal. The major points of interest included material properties and wear analysis of the third rail and shoe, finding the possible current, voltage, and power delivery amounts, and mostly how to set up a non-contact to sudden contact mechanism. Our team is concentrating on the third rail system only instead of the third rail and power system. This week we were able to set up communications using Slack and Shared Drive. We also had a Zoom meeting just to catch up on deliverables for the proposal. On the meeting on Wednesday, we set up a weekly meeting time for discussions and administrative work. This will occur each week on Thursdays from 12pm to 1pm. Today we set up Shared Drive and a group email for future use with communications to vendors. We discussed setting up Blogspot and research on deliverables.

The current third rail contact shoe design. Taken from Spring 2019 Presentation
























SPARTAN Superway Wayside Power & Distribution 2019-2020 Final Presentation

The SPARTAN Superay Wayside Power & Distribution Team would like to thank all individuals, professors, and organizations who helped in m...