Saturday, February 29, 2020

The First Spring 2020 Presentation and Updated CAD

On Wednesday (02/26), the Spartan Superway Wayside Power Team were doing the first presentation of the ME 195B. After the presentation finished, the mechanical team and the electrical team are continuing to develop their works. The electrical team were working on the problem that they had last week which were not able sent current to the motor. Apparently, they found at that it was the wire issue. For the mechanical team, we were continuing on our work with the CAD design on the current collector.



They are working to integrate the arm mechanism to the bogie design from the last year team. The figures above are our work in progress assembly of our current collector. We are still determining the best linear actuator that we are going to use. The above figures of the linear actuator are just a CAD that we pull up from the actual McMaster shelves.

Written By,
Reynaldo Jahja

No comments:

Post a Comment

SPARTAN Superway Wayside Power & Distribution 2019-2020 Final Presentation

The SPARTAN Superay Wayside Power & Distribution Team would like to thank all individuals, professors, and organizations who helped in m...